Facilities Project Review and Environmental
Compliance
Policy 2-303
Scope:
This policy governs the adoption and use of objectives, criteria, and procedures for environmental review of District projects.
This policy applies to any proposed projects, including but not limited to:
New construction or additions to school facilities;
Modernization or major alterations;
Site acquisition or expansion; and
Installation of modular classrooms or portable buildings.
1. Environmental Review (CEQA Compliance)
In accordance with the California Environmental Quality Act (CEQA):
The District shall serve as the "Lead Agency" for its own projects.
The Superintendent or designee shall determine whether a project is exempt, requires a Negative Declaration (ND), Mitigated Negative Declaration (MND), or full Environmental Impact Report (EIR).
CEQA review must be completed before project approval, contract execution, or site acquisition.
2. Site Acquisition and Environmental Assessments
Prior to acquiring property for school use:
A Phase I Environmental Site Assessment (ESA) shall be completed (Ed. Code § 17212).
If the site is potentially contaminated, oversight from the Department of Toxic Substances Control (DTSC) shall be obtained (Ed. Code § 17213).
3. Coordination with State Agencies
The Superintendent or designee shall coordinate as needed with:
California Department of Education (CDE) for site and plan approvals
Office of Public School Construction (OPSC) for state-funded projects
Local planning, zoning, and fire authorities as required
4. Board Oversight and Public Involvement
All CEQA documents requiring Board certification or adoption (e.g., ND, MND, EIR) shall be presented to the Board for action.
The public shall be notified and invited to comment on applicable projects in accordance with CEQA guidelines.
The Board may hold public hearings as appropriate.
Administrative Regulations
1. Initial Project Review
When a facilities project is proposed, the Superintendent or designee shall:
Confirm project scope and timeline
Determine CEQA applicability
Identify required permits or approvals
2. CEQA Process
Determine project type:
Categorical Exemption (minor alterations, small additions); or
Initial Study leading to ND, MND, or EIR.
Prepare appropriate documentation or engage consultant support if needed.
File notices (e.g., Notice of Exemption or Intent) with County Clerk and State Clearinghouse if required.
Maintain record of public comments and responses.
3. Site Acquisition and Due Diligence
Conduct Phase I ESA before purchasing any property .
If hazardous materials are found, complete a Preliminary Endangerment Assessment (PEA) and consult DTSC.
4. Agency Coordination
Submit CEQA clearance and site plans to California Department of Education (CDE) and Office of Public School Construction (OPSC), if required.
Notify and coordinate with local authorities (planning, fire, utilities).
Confirm zoning and general plan consistency.
5. Board Actions and Recordkeeping
Present all CEQA findings and site acquisition decisions to the Board for approval
Maintain official project and environmental records in the District Office for public review.
Ensure all CEQA deadlines, notices, and filing requirements are met.